Please enable JavaScript to view this site.

GeoDict User Guide 2025

Estimate Three-Phase Contact Line

The Estimate Three-Phase Contact Line algorithm estimates the length of the contact line between the phases in a three-phase system and the number of voxel edges of the contact line in the Cartesian directions. The length of the contact line, which strongly depends on the structure’s topology, is often important for the performance of a material (for example for catalysts).

The Estimate Three-Phase Contact Line command:

  • Options
    Set the parameters for the analysis.
  • Results
    View the computed results.

©2025 created by Math2Market GmbH / Imprint / Privacy Policy